I have not washed it yet. I have swept out the back. Got the trash out of the inside and vacuumed it out. Then I parked it under a persimmon tree.
Announcement
Collapse
No announcement yet.
Project Mustang Consolidation
Collapse
X
Collapse
-
-
Comment
-
Originally posted by Russell View Post
The underside of a 5.8L GT40 intake manifold with bad gaskets....
The text was about the truck in general. I swept the bed of the truck, and started cleaning the cab.
Comment
-
- Likes 2
Comment
-
The lighting is Running! I pressure washed it to get the top layer of crud off. It got dark on me so I will finish washing it another day. I started making a list of all the things that need fixing. Hopefully the junkyard is open tomorrow and I can grab a few of them.
- Likes 2
Comment
-
Comment
-
I went and picked up a steel F150 driveshaft to get the truck back on the move. So far so good. The brakes are spongy so in need to figure that out. I need to get back on my diy turbo install on Foxbody. I want to fix all the little things clean it up and enjoy it but there are a lot of little things. If anyone wants a project I might let it go it's very distracting, running, sitting there saying work on me while the mustang is in jackstand jail.
- Likes 1
Comment
-
Multiple project cars is good. If you get frustrated with one, you can change gears and fiddle with the others.Life is short. Be a do'er and not a shoulda done'er.
1969 Galaxie 500 https://bangshift.com/forum/forum/ba...ild-it-s-alive
1998 Mustang GT https://bangshift.com/forum/forum/ba...60-and-a-turbo
1983 Mustang GT 545/552/302/Turbo302/552 http://www.bangshift.com/forum/forum...485-bbr-s-83gt
1973 F-250 BBF Turbo Truck http://www.bangshift.com/forum/forum...uck-conversion
1986 Ford Ranger EFI 545/C6 https://bangshift.com/forum/forum/ba...tooth-and-nail
- Likes 1
Comment
-
Originally posted by BBR View PostMultiple project cars is good. If you get frustrated with one, you can change gears and fiddle with the others.there is a ton of stuff to move, put away or trash to get a car on that spot. I am sure that's the best option.
I had the idea that two project cars would be best. One as a long term project and the second as a short term project. With the goal of making a profit on the short term project, to help fund the long term project.
Comment
-
- Likes 2
Comment
-
I finished tacking the hot side (up-pipe) together last night. What do you think? I need to figure out the waste gate placement. I was going to put it in the side just below the flange. I was told that is not the best. I might be able to put it in the kink between the merge and straight section below the flange. But I am afraid it will be harder to get to there.
I took pictures but I am getting a file extension error?Last edited by Russell; July 15, 2021, 09:09 AM.
- Likes 1
Comment
Comment