Got the footer poured today met up with the block guy tonight he's ready to go. He may start Saturday but its suppose to rain all day Saturday but 60 and sunny sunday. A big relief getting the footer in today wants we get the block in it can collapse all it wants. Will get pics here soon.Greg & Mendy Dayton, Ohio 2007LH 2008LH 2010LH 2011LH 2012 1st 2 stops 2013LH 2015 1st 2 stops2016LH 2017 first and last stops . 2018 LH ("It's better to be dead and cool than alive and uncool!! Harley Davidson!")
- Likes 4
Comment
-
Day two of code class...ten hours of electrical code changes....could be more entertaining watching the freezing rain last night here at the hotel... I guess that's my punishment for being an alleged enabler.... often accused of, but, never convicted....Patrick & Tammy
- Long Haulin' 2008, 2009, 2010, 2011, 2012, 2014...Addicting isn't it...??
- Likes 3
Comment
-
No block work today pouring down rain but I do need to pick up mortar and sand and some wire mesh for them. Suppose to be sunny and dry tomorrow. So maybe tomorrow.Greg & Mendy Dayton, Ohio 2007LH 2008LH 2010LH 2011LH 2012 1st 2 stops 2013LH 2015 1st 2 stops2016LH 2017 first and last stops . 2018 LH ("It's better to be dead and cool than alive and uncool!! Harley Davidson!")
Comment
-
Got all the materials picked up had to put the dump trailer in the shop so the sand can dry out for tomorrow. They are going to start at 7:30am in the morning so I've got to get everything dry had to trap up all the block and mortar so it would stay as dry as possile. Funny thing it rained hard most of the day and the footer didn't collapse it's funny how 20yds of concrete can stop that very thing. Hope to be calling for inspection on Monday so we can start back fill soon and then a slab.Greg & Mendy Dayton, Ohio 2007LH 2008LH 2010LH 2011LH 2012 1st 2 stops 2013LH 2015 1st 2 stops2016LH 2017 first and last stops . 2018 LH ("It's better to be dead and cool than alive and uncool!! Harley Davidson!")
- Likes 2
Comment
-
The block guys showed up on time and by 5:30pm was done and packing up. They did a great job plus it is now done. I have pictures but me and photobucket are not getting along again. I've never seen so much foundation for a garage in my life.Greg & Mendy Dayton, Ohio 2007LH 2008LH 2010LH 2011LH 2012 1st 2 stops 2013LH 2015 1st 2 stops2016LH 2017 first and last stops . 2018 LH ("It's better to be dead and cool than alive and uncool!! Harley Davidson!")
- Likes 2
Comment
-
This weekends project was to get the foundation insulated and waterproofed got all the stuff delivered but now I have to work. Plus I have to put a motor in my nephews truck by Monday or hes going to lose his job. So back fill will have to wait till I get time to get it ready. This shop is starting to sound like a torino project.Greg & Mendy Dayton, Ohio 2007LH 2008LH 2010LH 2011LH 2012 1st 2 stops 2013LH 2015 1st 2 stops2016LH 2017 first and last stops . 2018 LH ("It's better to be dead and cool than alive and uncool!! Harley Davidson!")
- Likes 1
Comment
-
Well I did get the foundation done and back filled today just paid someone to do it. If you can't get it done yourself just pay someone else to do it. But at least done.Greg & Mendy Dayton, Ohio 2007LH 2008LH 2010LH 2011LH 2012 1st 2 stops 2013LH 2015 1st 2 stops2016LH 2017 first and last stops . 2018 LH ("It's better to be dead and cool than alive and uncool!! Harley Davidson!")
- Likes 1