F.Y.I. Wisconsin is expanding I-94 from the wi-il state line to the airport. adding 1 lane in each direction.
although it may not be far enough along by june; it is unknown which areas will be done sooner because of the STIMULUS money flowing. The schedule for some of it will change and start earlier. it is already under construction in certain areas. I will try and post the important issues that will possibly be encountered by the tour here.
All the interchanges will be done over a 4 year period. as far as the Racine on and off ramps and interchanges....none are on the 2009 schedule at this time.several going south are being done already; so that may be an issue to head to SOUTH BEND. more to follow.
although it may not be far enough along by june; it is unknown which areas will be done sooner because of the STIMULUS money flowing. The schedule for some of it will change and start earlier. it is already under construction in certain areas. I will try and post the important issues that will possibly be encountered by the tour here.
All the interchanges will be done over a 4 year period. as far as the Racine on and off ramps and interchanges....none are on the 2009 schedule at this time.several going south are being done already; so that may be an issue to head to SOUTH BEND. more to follow.
Comment