Well I may have the record in this category ... I have basically 3 months to complete the work to my 67 Camaro to run my first HRPT this year.
I am starting with a good running and driving car;
Gen. 1 355 SBC Dual Plane intake, 750 DP and full MSD ignition
Change out M21 Muncie for a new T56 Magnum 6 speed
Change out rear end Posi 12 bolt with 4.56 gears for 3.55 gears ( I will out source this job )
Note, I will still take out rear end and take to my guy for gear switch
Swap original gas tank for new Tanks Inc. tank with notched corners, 255 Walbro pump and install new fuel send and return line
Swap all trim brakes for new 4 wheel disc brakes from Master Power in Mooresville, NC
Swap Holley 750 DP to Fitech Go 4 600 HP fuel Injection
Install Vintage Air complete system, I removed the original equipment from car earlier this year
No rust in the car at all, new quarters installed last year
Needs seats recovered
Install new windshield and back glass
Install Stereo and speakers
Carpet and Sound Matt to be installed
Install new Autometer gauges
Install 6AL Box and Coil under dash to clean up firewall
All the above NEEDS to be done in the next 3 months so I can do the tour. I know the car needs paint but will that will have to wait. I have a good friend that will help some of the weekends but its just me after work at night to complete the list. I know this is a lot but I guess some people need that carrot in front of them to complete the job.
Any advice would be much appreciated.
I am starting with a good running and driving car;
Gen. 1 355 SBC Dual Plane intake, 750 DP and full MSD ignition
Change out M21 Muncie for a new T56 Magnum 6 speed
Change out rear end Posi 12 bolt with 4.56 gears for 3.55 gears ( I will out source this job )
Note, I will still take out rear end and take to my guy for gear switch
Swap original gas tank for new Tanks Inc. tank with notched corners, 255 Walbro pump and install new fuel send and return line
Swap all trim brakes for new 4 wheel disc brakes from Master Power in Mooresville, NC
Swap Holley 750 DP to Fitech Go 4 600 HP fuel Injection
Install Vintage Air complete system, I removed the original equipment from car earlier this year
No rust in the car at all, new quarters installed last year
Needs seats recovered
Install new windshield and back glass
Install Stereo and speakers
Carpet and Sound Matt to be installed
Install new Autometer gauges
Install 6AL Box and Coil under dash to clean up firewall
All the above NEEDS to be done in the next 3 months so I can do the tour. I know the car needs paint but will that will have to wait. I have a good friend that will help some of the weekends but its just me after work at night to complete the list. I know this is a lot but I guess some people need that carrot in front of them to complete the job.
Any advice would be much appreciated.
Comment