I have some trimming to do in the front of the rear fenders. I added a piece to each side, and left extra material so I could roll the edge nice. There is plenty of room for the tall tire if need be.
The goal is to be at a local strip by the end of June. Then we go to Illinois in July for Meltdown drags, then on to Drag Week. I won't have any time on it until Friday, but the pass side door is next, then trunk lid. Then I most likely will start on the steering column, and brake/gas pedal setup, and wiring. The engine block has to go back to the machine shop for a final cleaning- that will be on Friday. Then upon its return, it is ready for assembly and install.
The goal is to be at a local strip by the end of June. Then we go to Illinois in July for Meltdown drags, then on to Drag Week. I won't have any time on it until Friday, but the pass side door is next, then trunk lid. Then I most likely will start on the steering column, and brake/gas pedal setup, and wiring. The engine block has to go back to the machine shop for a final cleaning- that will be on Friday. Then upon its return, it is ready for assembly and install.
Comment