In this video from the collaboration Fire Truck turned Ramp Truck, where Make It Kustom and HalfAss Kustoms have gotten together to thrash on Karl’s Make It Kustom rig, you’ll see the wiring coming together, including some really good tips and tricks for getting started on a wiring project. Plus, the steering is going together which is VERY complicated on this build in comparison to the norm because the cab has to tilt. But it’s nothing Karl and Brent can’t totally over engineer. LOL. The goal for this project is to make it run and do a burnout before Brent has to go back home to Manitoba. It’s a lot to do in just 4 days, but that’s what they are trying to make happen.
That’s right, just 4 days to get the cab mounted and the tilt function working, fabricating and installing an entirely new steering system, mounting and installing the engine and transmission, cooling system, engine wiring, cab wiring, cutting the rear chassis and installing a step notch and full fabricated 4-link suspension system, and so much more. No, it won’t be a finished ride at the end of the series, but it should be able to be moved in and out of the shop under its own power so that Karl will be able to make the big ramp happen.
Check it out below and make sure you comment in the comments section below with what you think about this cool project.